2000

Establishment of enterprise technology center.

We have organized several team visits to Europe, the United States, Japan and other countries to study and learn new technologies of building energy efficiency and building industrialization, and have continuously carried out international exchanges and cooperation with advanced design, manufacturing and construction enterprises in the industry.

2004

Put forward the development policy of “technological innovation, transformation and upgrading, and advancing to the modernization of the construction industry”, and identified building energy saving and building industrialization as the direction of the technology center.

2009

The technology center was approved to become a Shanghai-level technology center.

2013

Successful development of own system.

2014

Sheshan completed the construction of its first precast factory.

2015

Prefabricated assembly 1# pilot building constructed successfully.

2016

The pilot buildings of Sheshan 21 Mound 39A Lot 1# and 2#, which were built by our own system, were successfully constructed and selected as the 2016 Assembly Building Technology Demonstration Project by the Ministry of Housing and Construction.

2017

Construction of the High Comfort Ultra Low Energy Assembly 2 pilot building began.

2018

Haiyan assembly building base was officially launched.

2019

Fully Prefabricated Assembly CJ Wall Structure 3# Pilot Building constructed successfully.

2020

New system of self-resetting shear wall structure;

R&D and construction of 4/5/6# pilot building;

Lishui assembly building base officially launched.

2021

Lishui's first AA-grade, low-energy assembly building, the Industrial Innovation Complex Project, was successfully constructed.