Establishment of enterprise technology center.
We have organized several team visits to Europe, the United States, Japan and other countries to study and learn new technologies of building energy efficiency and building industrialization, and have continuously carried out international exchanges and cooperation with advanced design, manufacturing and construction enterprises in the industry.
Put forward the development policy of “technological innovation, transformation and upgrading, and advancing to the modernization of the construction industry”, and identified building energy saving and building industrialization as the direction of the technology center.
The technology center was approved to become a Shanghai-level technology center.
Successful development of own system.
Sheshan completed the construction of its first precast factory.
Prefabricated assembly 1# pilot building constructed successfully.
The pilot buildings of Sheshan 21 Mound 39A Lot 1# and 2#, which were built by our own system, were successfully constructed and selected as the 2016 Assembly Building Technology Demonstration Project by the Ministry of Housing and Construction.
Construction of the High Comfort Ultra Low Energy Assembly 2 pilot building began.
Haiyan assembly building base was officially launched.
Fully Prefabricated Assembly CJ Wall Structure 3# Pilot Building constructed successfully.
New system of self-resetting shear wall structure;
R&D and construction of 4/5/6# pilot building;
Lishui assembly building base officially launched.
Lishui's first AA-grade, low-energy assembly building, the Industrial Innovation Complex Project, was successfully constructed.